Krah Pipes Manila, Inc., the global leader in manufacturing large-diameter High-Density Polyethylene (HDPE) piping systems, is proud to showcase its vital role in the New NAIA Terminal 5 Drainage Project. Developed in collaboration with New NAIA Infra Corp., this landmark infrastructure initiative is strategically located at the previous Nayong Pilipino site.
Designed by the premier engineering and architectural firm Phil. JAC, Inc., Terminal 5 is engineered to drastically increase airport capacity and resilience. To support this vision, Krah Pipes Manila, Inc. is working directly on-site during the critical jointing and installation phases with ArchEn Technologies Inc., the project contractor under San Miguel Corporation (SMC), ensuring a world-class stormwater management system built to last.
| Project Component | Details |
|---|---|
| Project Name | New NAIA Terminal 5 Drainage Project |
| Primary Client | New NAIA Infra Corp.(NNIC) |
| Project Location | Former Nayong Pilipino Site, Pasay/Paranaque |
| Design Firm | Phil. JAC, Inc. |
| Contractor Partner | ArchEn Technologies Inc. (San Miguel Corporation) |
| Piping Technology | Krah Large-Diameter HDPE Piping Systems |
| Key Installation Sites | GSE Road & International Parking Aprons (A380 & Boeing 777 zones) |
| Specifications | Details |
|---|---|
| Account | Corporate |
| Pipe Used | Profiled & Covered Wall Pipe |
| Application | Land Development |
| Pipe ID/OD Size | 2100 mm, 800 mm, 1000 mm, 1200 mm , 1400 mm |
| Pipe Length | 888 Linear Meter |
| Specifications | Details |
|---|---|
| Pipe Quantity | 148 |
| Ring Stiffness | SN 4 |
| Pressure Rating | |
| Location | Former Nayong Pilipino Site, Pasay/Paranaque |
| Duration | 2026-Ongoing |
Meeting the rigorous design standards set by Phil. JAC, Inc. requires a drainage network capable of handling massive hydraulic volumes and extreme structural loads. Krah Pipes Manila, Inc. engineered and supplied a versatile range of large-diameter HDPE pipes tailored specifically for this high-stakes aviation environment:
High-Load Aviation Footprints
The structural integrity of Krah HDPE pipes makes them uniquely qualified for airport environments where heavy live loads are a constant variable. The systems have been precisely positioned across two critical high-traffic zones:
A defining cornerstone of this project's success is the seamless operational synergy between Krah Pipes Manila, Inc. and ArchEn Technologies Inc. — San Miguel Corporation.
During the critical jointing process, Krah’s technical specialists work hand-in-hand with ArchEn’s on-site engineering teams. Utilizing state-of-the-art electrofusion welding and precision jointing techniques, the collaboration ensures that every single pipe link transforms into a completely homogenous, leak-proof, and monolithic structure. This flawless jointing process eliminates the risk of water infiltration or soil exfiltration, permanently safeguarding the terminal's foundation.
Project Impact: By combining the visionary design of Phil. JAC, Inc., the robust contracting capabilities of San Miguel Corporation through ArchEn Technologies, and Krah's world-class HDPE manufacturing, the New NAIA Terminal 5 is being equipped with a sustainable, flood-resilient drainage network built to international aviation standards.