PUBLIC WORKS & HIGHWAYS

Network Development - Construction of By-pass and Diversion Roads-Tacloban-Palo Including Drainage System

In the area of Tacloban and Palo in Leyte, the roads that connect different towns and communities play a very important role in daily life. These roads are used by people going to work, transporting goods, and supporting local businesses. But because of heavy rains and storms that often hit the region, flooding has become a common problem. It causes delays, damages roads, and affects the safety of the people. Because of this, the Network Development - Construction of By-pass and Diversion Roads-Tacloban-Palo Including Drainage System was developed to improve the drainage system and make the roads safer and more reliable.

TThe project used KPMI HDPE Pipes, specifically 1000mm Large Diameter HDPE Pipes, because they are strong and built to last for a long time. These pipes are very effective for drainage systems since they can handle large amounts of water and do not easily get damaged. One important part of the installation is the use of electrofusion jointing, which helps connect the pipes securely so that water will not leak. This makes the system more efficient and reliable, especially during heavy rainfall.

 

Specifications Details
AccountDPWH
Pipe UsedProfiled Wall Pipe
ApplicationDrainage
Pipe ID/OD Size1000 mm
Pipe Length132 Linear Meter
Specifications Details
Pipe Quantity22
Ring Stiffness
Pressure Rating
LocationPALO, TACLOBAN CITY
DurationOctober 2-25, 2025- Completed

These Large Diameter HDPE Pipes have many advantages. They do not rust or corrode, they are flexible so they can adjust to ground movement, and they are easier and faster to install compared to traditional materials. With the help of KPMI’s supply and install services, the project was completed efficiently while maintaining high quality standards.

By improving the drainage system, the project helps reduce flooding, protect the roads, and make travel safer for everyone. It also helps local industries and businesses by keeping transportation routes open. The Tacloban–Palo Drainage Project, together with the use of KPMI HDPE Pipes and Large Diameter HDPE Pipes, is an important step in helping the region grow and building a more progressive and resilient community.

GERMAN TECHNOLOGY, FILIPINO INGENUITY

Scroll to Top